Baghdad Aircraft Maintenance Hangar
(Baghdad, Iraq) (03.2016– 10.2016)
Gorkem Construction Co.
The scope of work for this project consists of the mechanical design of a Boeing 737-900ER Hangar that is intended to provide maintenance support spaces and Office spaces. There are many shops, storage areas, office areas etc. under the scope of the project. Complete mechanical and fire protection systems of the Aircraft Maintenance Hangar, and site utility infrastructure are designed under the scope of this project.
REFERENCES (MILITARY COMPLEXES)

Kabul LSA
(Kabul, Afghanistan) (10.2014-02.2016)
Contrack International, Inc.
Water distribution and sewer collection system designs of Kabul LSA. The systems are designed for an occupation of 1500 people in total. Water wells, water storage tanks, booster pumps are designed together with the water distribution system. Sewer is collected by gravity sewer lines. Lift stations are designed for some locations where gravity sewer collection is impossible to pressurize the sewer. All sewer water is routed to a sewer collection tank.

KAIA Air Wing
(Kabul, Afghanistan) (07.2012-04.2014)
Yuksel Construction Co. Inc.
The project consists of the design, site adaptation and construction of new permanent facilities for the KAIA North air base. Complete HVAC and plumbing designs of Hangar, Storage Buildings, Maintenance Buildings, Clinic Building etc. were made. An assessment of the existing water distribution system and existing sewer collection system is performed. Fuel storage and supply system is designed for the generators located on the site.

Eastside Utilities
(Bagram, Afghanistan) (09.2012-11.2014)
Serka Construction
The project consits of designing various improvements and expansions to the Bagram Airfield utility network. Utility service is provided to eastern expansion zone. The design include; an expansion to existing water treatment plant, new water wells, 12.000 meters water distribution piping, 6000 meters gravity sewer piping, 2200 meters sanitary force main piping and sanitary lift stations. Also the project includes the connection of 13 existing facilities to the base utility (water and sewer) network.

Garrison Support Kandak
(Kabul, Afghanistan) (03.2013-05.2014)
Contrack International, Inc.
The project consists of the design, site adaptation and construction of new permanent facilities for the Garrison Support Kandak (GSK) and Special Mission Wing (SMW) Headquarters. Complete HVAC and plumbing systems of Headquarters, Barracks, Maintenance Buildings, Clinic Building, Hangars etc. were designed by producing special solutions for different types of the buildings. An assessment of the existing water distribution system and existing sewer collection system is performed to determine a new water and sewer system will be designed for the buildings or not. The new water wells, elevated water storage tanks and sewer system with lift stations are designed as a consequence of that assessment reports.

Bagram Troop Housing
(Bagram, Afganistan) (12.2011-10.2012)
Yuksel Construction Co. Inc.
Preparing site adapt drawings and installation details for 30 buildings in three different places. The project includes HVAC system details and site application. Also water distribution system and sewer collection systems are designed in scope of the project.

KAF M-20 Project
(Kandahar, Afganistan) (10.2011-08.2012)
Contrack International Inc.
Water distribution and sewer collection system designs of northern parts of Kandahar Airfield. The systems are designed for an occupation of 3323 people in total. Water wells, water storage tanks, booster pumps are designed together with the water distribution system. Sewer is collected by gravity sewer lines. Lift stations are designed for some locations where gravity sewer collection is impossible to pressurize the sewer. All sewer is routed to a waste water treatment facility.

Dog Kennel Facility
(Kandahar, Afganistan) (12.2010-02.2011)
Yenigun Construction Co. Inc.
Complete HVAC, plumbing and Fire protection design of dog kennels and veterinary buildings. Also Potable water storage tanks, booster pumps, sewer collection system and sewer tanks are designed in scope of this project.

Ammunution Supply Point
(Camp Bastion, Afganistan) (06.2010-11.2010)
Lakeshore Engineering Services
Complete HVAC and plumbing systems of Admin Buildings, Workshops, Storages, Maintenance Buildings etc. were designed according to the project specific needs for different types of the buildings. Also water supply- distribution system and sewer collection system are designed for these buildings.

KAIA North Dining Facility
(Kabul, Afganistan) (02.2010-03.2010)
YUKSEL Construction Co. Inc.
Designing mechanical systems of a Dinning Facility with kitchen areas and dining halls. HVAC, Plumbing and Fire fighting systems of the building is designed. The building is designed for KBR. HVAC system of the building is provided by packaged air conditioning units, electrical heaters, split heat pump units and exhaust fans. Industrial kitchen exhaust systems are designed for the kitchen areas. Soft water systems, water heaters, circulation pumps and water distribution lines are designed for the building in scope of the plumbing work.

Camp Bastion Phase I Project
(Camp Bastion, Afganistan) (05.2009-10.2009)
Lakeshore Engineering Services Inc.
Mechanical design of the facilities located in Camp Bastion in the Phase I scope. The mechanical systems include HVAC systems in some buildings and generator fuel distribution systems.

Convoy Support Center Phase II Project
(Tallil Air Base, Iraq) (02.2009-06.2009)
KBR & Kulak Construction Co.
Potable water Distribution and Sanitary Sewer Collection Systems of Conwoy Support Center. The Project is designed for US Army Corps of Engineers Transatlantic Programs Center

Kaia North New Accomodation Buildings and Offices
(Kabul, Afganistan) (01.2009-09.2009)
YUKSEL Cons.Co.
Complete Mechanical Design of four accomodation buildings with 108 to 120 rooms and two office buildings have been done. Two of the accomodation units are designed for NAMSA and the other two are designed for US military. The accomodation buildings include bedrooms and general WC and shower areas. The office buildings have open offices, manager offices, WC’s and break rooms etc.

Dining Facility
(Camp Delta, Iraq) (09.2008-05.2009)
KBR & Kulak Construction Co.
Designing mechanical systems of 6000 m² Dinning Facility building, 350 m² Power plant, building, Water and Fuel storage and distribution. Also sanitary sewer collection and potable water dist. Systems. The buildings are designed for US Army Corps of Engineers Transatlantic Programs Center.

Base Camp Romania, (Forward Operating Site, Phase I)
(Constanta, Romania) (08.2007-11.2008)
FEM-JV
34 different buildings were designed for U. S. Army Corps. of Engineers Europe District, Wiesbaden. Design period for mechanical part is finished in late 2008. Construction phase continues. The complex construction cost is approximately $60 million. Project involves housing buildings, maintenance buildings, dining buildings, latrines, training buildings, utility buildings etc.

Tikrit Camp Dining facility,
(Tikrit, Iraq) (05.2006-10.2006)
YUKSEL Cons.Co.
Complete mechanical design of the 5000 pax dining facility had been accomplished. This project had been designed for U. S. Army Corps. of Engineers Afghanistan District.

Temporary Cantonment Area
(Camp Anaconda, Iraq) (09.2006-02.2007)
KBR & YUKSEL Cons.Co.
Complete mechanical design of the 4 pods containing 30 containers and site has been completed. This project had been designed for US Army Corps of Engineers Transatlantic Programs Center.