REFERENCES (COMMERCIAL COMPLEXES)

Gaziemir Culture and Arts Center.png
Gaziemir Culture and Arts Center

(Izmir, Turkey) (01.2022-On Going)

The scope of work for this project consists of the HVAC, plumbing and fire fighting system design.

The building consists of auditorium, foyer areas, administrative areas, technical spaces, kitchen, parking garage areas.

Ostim Commercial and Residential Building

(Ankara, Turkey (07.2016-10.2016)

The scope of work for this project consists of the HVAC, plumbing and fire fighting system design of a commercial building with shopping areas.

Sadikoglu Commercial Building

(Ankara, Turkey (06.2016-08.2016)

The scope of work for this project consists of the HVAC, plumbing and fire fighting system design of a commercial building in Incek Ankara.

Athens US Embassy

(Athens, Greece)  (03.2016-06.2016)

Desbuild Incorporated,

The scope of this project is to prepare the MEP Coordination drawings for the Athens US Embassy for Overseas Buildings Operations of US department of state. Under the scope, coordinated and seperated MEP drawings are formed in each particular dicipline (such as HVAC, Plumbing, Fire fighting, Telecom, power, TSS etc.)

Koc Towers, Tanap Office

(Ankara, Turkey)  (01.2015-08.2016)

Tanap A.Ş.

Onsite consultancy services are provided for the mechanical systems of an office Tower in Ankara. Site support works include submittal reviews, contractor quality control, quality assurance, site technical support.

Ground Level BMP3.jpg
Capitol Vista Office Building

(Ankara, Turkey)  (01.2015-08.2016)

Dolphin Overseas Inc.

Onsite consultancy services are provided for the mechanical systems of an office Tower in Ankara. Site support works include submittal reviews, contractor quality control, quality assurance, site technical support. MEP Coordination drawings are also prepared for the building in a 3D BIM model.

Australian Embassy Ankara

(Ankara, Turkey)  (01.2015-08.2016)

Australian Embassy, Ankara

Mechanical consultancy services are provided for the Australian Embassy in Ankara. Site support works include design modifications, submittal reviews, quality assurance, site technical support.

Montreal US Embassy

(Montreal, Canada)  (01.2015-06.2015)

Desbuild Incorporated,

 

The scope of this project is to prepare the MEP Coordination drawings for the Montreal US Embassy for Office of Overseas Buildings Operations of US department of state. Under the scope, all MEP diciplines are drawn in 3D BIM model and coordinated in 3D space. Then 2D coordinated and seperated MEP drawings are formed in each particular dicipline (such as HVAC, Plumbing, Fire fighting, Telecom, power, TSS etc.)

Celebrate Hall and Restaurant

(Mosul, Iraq)  (04.2013-01.2015)

Diwan Company Inc.

Celebrate hall and restaurant is a component of a large residential compound in Mosul. Complete mechanical and plumbing sytem of the building have been designed.

Bowling Hall

(Mosul, Iraq)  (04.2013-01.2015)

Diwan Company Inc.

This building is an entertainment center which is a component of a large residential compound in Mosul. The building consists of bowling halls, billard halls and playgrounds. HVAC system of the building is designed by providing packaged air conditioning units, split air conditioning units and exhaust fans. The plumbing system including hot-cold water distribution systems and sewer collection systems has been designed.

Closed Sport Court

(Mosul, Iraq)  (04.2013-01.2015)

Diwan Company Inc.

This building is a sports hall for 400 people which is a component of a large residential compound in Mosul. Complete mechanical and plumbing sytem of the building have been designed.

Shopping Center

(Mosul, Iraq)  (04.2013-01.2015)

Diwan Company Inc.

This building is a shopping center wtih the total area of 2020 m2 which is a component of a large residential compound in Mosul. Complete mechanical and plumbing system of the building have been designed.

Mosque and Public Housing

(Mosul, Iraq)  (04.2013-01.2015)

Diwan Company Inc.

This buildings are mosque and public housing with the total area of 2000 m2 which is a component of a large residential compound in Mosul. HVAC system include split heat pump units and exhaust fans. Plumbing system of the building is designed to include water storage tanks, domestic hot-cold water distribution lines and sewer collection system.

Wellington U.S. Embassy

(Wellington, New Zealand) (06.2014-  12.2015 )

Desbuild Incorporated

The project includes the preparing 3D modelling, suspended ceiling coordination and shop drawings related to the ventilation systems, VRF systems, fire protection systems, plumbing systems, electrical conduit systems.

Coalition Operations Center

(Bagram, Afghanistan) (03.2012-07.2013)

Yuksel Construction Co. Inc.

Mechanical systems consultancy of a two floor operations center building in Bagram Airbase, Afghanistan. Water distribution system and sewer collection system plans are designed for the area. Also complete HVAC and fuel supply system is designed for the generator power plant building.

Theater Support Facility

(Bagram, Afganistan) (03.2012-03.2013)

Yuksel Construction Co. Inc.

Fire protection system design and site adapt drawings for the Theater Support Facility in Bagram Airbase. Fire protection system is provided by designing of sprinkler system for the building. Also fire hydrrants are provided for the site in scope of site utility design work. Water distribution system and site sewer collection system are designed for the building.

 

Secure Office Facility

(Camp Bastion, Afganistan) (03.2010-05.2010)

Metag Construction Co. Inc.

Mechanical design of the Secure office building and outside containerized buildings. Design works involve complete HVAC and Plumbing design of the whole facility.

 

Intelligence Fusion Cell Facility

(Kandahar, Afganistan) (05.2010- 06.2010)

Yenigun Construction Co. Inc.

Mechanical design of an intellignece facility in Kandahar, Afghanistan. Design works include HVAC systems and fire protection systems for office rooms, system rooms, operation rooms etc.

Administration Facility

(Kandahar, Afganistan) (05.2010-06.2010)

Gorkem Construction Co. OBD Construction Co. Inc.

Mechanical design of an intellignece facility in Kandahar, Afghanistan. Design works include HVAC systems and fire protection systems for office rooms, communication rooms, etc.

KAIA North SCIF Building

(Kabil, Afganistan) (05.2010- 06.2010)

Yuksel Construction Co. Inc.

Mechanical design of an intelligence facility in KAIA North Kabil, Afghanistan. Design works include HVAC systems for server rooms, system rooms, operation rooms etc. HVAC system of the building is provided by designing of VRV units and packaged air conditioning units.

KAIA North KBR Camp

(Kabil, Afganistan) (03.2010-05.2010)

Yuksel Construction Co. Inc.

Mechanical design of the Camp that will be used by KBR workers. Design works involve HVAC and Plumbing design of the whole facilities. Also water distribution system and sewer collection system are designed for the buildings.  

Bagram PEB Office Buildings

(Bagram Airbase, Afganistan) (11.2009-03.2010)

YUKSEL Construction Co. Inc.

Designing mechanical systems for  nine pre-engineered office buildings for NAMSA. The HVAC system of the all buildings are designed under the scope of this project. HVAC system of the building is provided by the designing of air handling units, VRV systems, electrical heaters and exhaust fans.

KAIA North Office Buildings

(Kabul, Afganistan) (07.2009-11.2009)

YUKSEL Construction Co. Inc.

Designing mechanical systems of “TCN Office Building” and “French OPS Office Building” in KAIA North Military Camp. The design involves HVAC, Plumbing and fire fighting systems of both office buildings.

Afghan National Army Command Headquarters Building,

(Kabul, Afghanistan) (03.2007-09.2007)

YUKSEL Cons.Co.

Complete mechanical design of the building had been accomplished. This project had been designed for U. S. Army Corps. of  Engineers Afghanistan District.

Djibuiti CLU&CWU Buildings

(Camp Lemmonier, Republic of Djibuiti, Africa) (07.2013-10.2013)

Complete Mechanical Designs of CLU&CWU buildings in the scope of the project. Site Sewer Collection System is also designed in the scope of the project.

 