
Baghdad Aircraft Maintenance Hangar
(Baghdad, Iraq) (03.2016– 10.2016)
Gorkem Construction Co.
The scope of work for this project consists of the mechanical design of a Boeing 737-900ER Hangar that is intended to provide maintenance support spaces and Office spaces. There are many shops, storage areas, office areas etc. under the scope of the project. Complete mechanical and fire protection systems of the Aircraft Maintenance Hangar, and site utility infrastructure are designed under the scope of this project.
REFERENCES (AIRFIELD FACILITIES)

Various Base Improvements for Mihail Kogalniceanu Airbase
(Constanta, Romania) (05.2018–02.2021)
77 -Bryan Construction Co.
This is a USACE Europe District project. The scope of work for this project is to prepare the UFGS specifications for the project and provide design review for the local selected design group. There is a fuel storage and distribution facility and some service buildings for the base in the project.

Khurais Range, F-15 Fleet Modernization Program
(Khurais, Saudi Arabia) (03.2017– 07.2018 )
Yenigun Construction Co.
This is a USAF project for Saudi Air Force. The scope of work for this project is to prepare the 3D MEP shop drawings, 3D coordination drawings, detailed BOQ’s of the F-15 airbase in Saudi Arabia. Design review and value engineering studies are made on behalf of the contractor.

Malatya JSF F-35 Airbase
(Malatya, Turkey) (06.2016- 11.2017 )
Havelsan Inc.
Complete Mechanical design of a new airbase for the first F-35 airbase in Europe. The project includes 22 buildings composed of training and simulation facilities, many types of maintenance hangars, administrative facilities, storage buildings etc. The project is developed by the Assistance of Lockheed Martin.

TAI (Turkish Aerospace Ind.) Fire Pump House
(Ankara, Turkey) (02.2017- 07.2017)
TAI
Complete Mechanical design of a fire pump house that will service whole TAI compound. 3 x 3000 gpm diesel fire pumps are used in the project to supply the high water demand of very large hangar buildings in the TAI compund.

Baghdad Aircraft Maintenance Hangar
(Baghdad, Iraq) (03.2016– 10.2016)
Gorkem Construction Co.
The scope of work for this project consists of the mechanical design of a Boeing 737-900ER Hangar that is intended to provide maintenance support spaces and Office spaces. There are many shops, storage areas, office areas etc. under the scope of the project. Complete mechanical and fire protection systems of the Aircraft Maintenance Hangar, and site utility infrastructure are designed under the scope of this project.

P8A Aircraft Hangar
(Isa Air Base, Bahrain) (11.2015–09.2016)
Contrack International Co.
The scope of work for this project consists of the design of P-8A Hangar that is intended to provide a sheltered space with maintenance support spaces. P-8A aircraft is designed by Boeing and modeled on the body of a 737 airliner. There are a number of facilities under the scope of the project which in particular is the hangar. Complete mechanical design of the Aircraft Maintenance Hangar, and site utility infrastructure are designed under the scope of this project. Also a Clear Water Rinse System (CWRS) is designed for rinsing the entire P-8A aircraft including a water system connection between the existing or relocated fire water distribution system and the CWRS to supply make-up water to the CWRS and all associated utility extensions and connections.

F-16 Beddown Package-6
(Balad Air Base, Iraq) (03.2014– 05.2019)
Contrack International Co.
The scope of work for this project consists of the design of eleven (11) new facility buildings including; new F-16 Facility buildings site adaptation, associated utilities and infrastructure for Iraq Air Force (IQAF). Also complete mechanical design of a Squadron Headquarter, Aircraft Maintenance Hangar, Missile Maintenance Facility, Hydrazine Facility, Fire Pump House, Booster Pump Houses, Aircraft Wash Rack, Latrines, Fuel Cell Maintenance Building and site utility infrastructure are designed under the scope of this project.

KC-130J Maintenence Facilities
(Al Mubarek AirBase, Kuwait) (07.2013- 04.2015)
Contrack International Inc.
The scope of work for this project consists of the design and construction of interim maintenance facilities for the Kuwait Air Force. These facilities will be required until permanent facilities will be created on New Mubarak Airbase. Complete mechanical designs of a C-130 hangar, a warehouse building, several maintenence trailers, training and operations centre, storage buildings and site utility infrastructure are made under the scope of this project.

SCA Hangar
(Kabul, Afghanistan) (12.2012- 04.2013)
Yuksel Construction Co. Inc.
Mechanical and Fire Protection designs of a helicopter hangar located in Camp Alvarado, Kabul, Afghanistan. The project is designed for Dynacorp USA. The Hangar area is approximately 3600 m2 with six helicopter bays. High expansion foam fire extinguishing system is designed for the hangar. HVAC systems include packaged air conditioning units, ducting and special exhaust systems to provide specific ventilation requirements of the hangar.

Air Traffic Control Tower
(Manas, Kyrgyzistan) (09.2011-06.2012)
Serka Construction - Raytheon Technical Services Company, LLC
Mechanical and Fire Protection systems are designed for an eight floor air traffic control tower in Manas International Airport. The project is made for U.S. Airforce. The tower has many different types of spaces like mechanical, electrical and communication rooms, admin spaces, office spaces and a control cab. HVAC design of the building is provided by designing of air handling units, ducts, fan coils, chillers, electrical heaters and variable types of exhaust fans. Plumbing system of the building is designed to include booster pumps, domestic hot-cold water distribution lines and sewer collection system. Also sprinkler system is designed to provide fire protection for the building.

Shindand ISR Apron, SOF/ISR SOF Helo Apron
(Shindand, Afganistan) (08.2011-03.2012)
Contrack International Inc.
Design of Water Distribution and Sewer Collection System of Shindand ISR Ramps. Project also includes HVAC, Plumbing and Fire Protection System designs of Barracks and Office Buildings. Fire water pumping and distribution system is designed for the Apron area. Sprinkler systems are designed for the buildings. Alsco complete HVAC and plumbing systems of the buildings have been desinged.

Mezar-E Shariff Air Detachment
(Mezar –e Shariff, Afganistan) (12.2011-12.2012)
Metag Construction Co. Inc.
Complete Mechanical Designs of several buildings in the scope of the project. The project involves different types of buildings like Dining Facility, Security Force HQ, Communication Facility, PAX Terminal, Aerial Port, vehicle fueling systems etc. and Complete HVAC and plumbing systems are designed for these buildings accordingly. Also the water storage tanks, well house and booster system of the site is designed in the scope of this project.

Helo Apron Taxiway
(Bagram, Afganistan) (12.2011-05.2012)
Yuksel Construction Co. Inc.
Complete Mechanical Designs of several F-16 hangars and pump houses are made under the scope of the project. Water storage tanks, well houses and water distribution system are also is designed in the scope of this project.

PAX and Cargo Terminals
(Shindand, Afganistan) (11.2010-05.2012)
Metag Construction Co. Inc.
HVAC and plumbing design of passenger and cargo terminals in Shindand Airbase. HVAC systems of the buildings are provided by of air handling units, packaged air conditioning units, electrical heaters, split heat pump units and exhaust fans. The plumbing system includes hot-cold water distribution and sewer collection lines. And a fuel storage and supply system is provided for the generators located on site.

RSOI Building and Cargo Warehouse
(Camp Bastion, Afganistan) (06.2010-11.2010)
Lakeshore Engineering Services
Complete HVAC and plumbing design of an Airfield Remote Secure Onward Integration Facility ( A type of passenger terminal) and a Cargo Warehouse. Packaged air conditioning units, electrical heaters, split heat pump units and exhaust fans are designed under the HVAC systems design. Plumbing and fuel systems are also designed per project specific requirements.

Bagram CAS Ramp Extension
(Bagram, Afganistan) (11.2010-05.2011)
CH2Mhill & 77 Construction Co. Inc.
Complete HVAC and Plumbing designs of Fighter shelters and Aviation and Operations Facilities in Bagram Afghanistan. Fighter shelter HVAC system includes special solutions, and special equipments to provide ventilation and air conditioning for a fuel cell shelter. Also the plumbing system of the building designed to provide water distribution and sewer collection. Additionally, compressed air system is provided for the building. A fuel storage-supply system is provided for the generators located on site. Water storage tank and booster pump house is designed to provide potable water to the buildings in the site.

Mezar –e Shariff Aviation Complex
(Mezar –e Shariff, Afganistan) (10.2010-10.2011)
Yuksel Construction Co. Inc.
HVAC and Plumbing designs of Fighter shelters, Mission Planning Facility and Maintenance Facility in Mezar –e Shariff Afghanistan. HVAC systems of the buildings are provided by designing of air handling units, packaged air conditioning units, heat recovery units, electrical heaters, split heat pump units and exhaust fans. Special solutions are produced for HVAC system of the maintenance workshop areas in Maintenance Facility. Also the plumbing system that include hot-cold water distribution system and sewer collection system for the buildings are designed. And a fuel storage-supply system is provided for the generators located on site.Water storage tank and booster pump house is designed to provide potable water to the buildings in the site.

PAX and Cargo Terminals
(Bagram, Afganistan) (06.2010-09.2010)
Yuksel Construction Co. Inc.
Complete HVAC, Plumbing and Fire protection system designs of passenger and cargo terminals in Bagram Airbase. HVAC systems of the buildings are provided by air handling units, packaged air conditioning units, electrical heaters, split heat pump units and exhaust fans. The plumbing system includes hot-cold water distribution system and sewer collection systems. Sprinkler systems are also designed to provide fire protection for the terminal buildings.

Bagram Aviation Support Facility
(Bagram, Afganistan) (06.2010-09.2010)
Yuksel Construction Co. Inc.
Mechanical and Fire protection systems design of an Aviation support facility in Bagram Airbase. The building involves both shop areas and office areas.

Tornado Shelters
(Mezar-e Sharif, Afganistan) (02.2010-04.2010)
Aydeniz Construction Co. Inc.
Complete HVAC design of four Tornado Aircraft Shelters for NAMSA. The complete HVAC system of the shelters is designed under the scope of this project.

C-130 Aircraft Hangars
(Bagram Airbase, Afganistan) (01.2009-09.2009)
CH2Mhill & YUKSEL Cons.Co.
Complete mechanical and fire protection system design of C-130 aircraft hangars located in Bagram Airfield. The project is designed for US Army Corps of Engineers Transatlantic Programs Center. The Hangar area is approximately 5500 m2 with two C-130 bays. High expansion foam fire extinguishing system is designed for the hangar. HVAC systems include packaged air conditioning units, ducting and special exhaust systems to provide specific ventilation requirements of the hangar.

Helicopter Hangars
(Bagram Airbase, Afganistan) (01.2009-09.2009)
CH2Mhill & YUKSEL Cons.Co.
Complete Mechanical Design of Helicopter Hangar with three bays located in Bagram Airfield. The project is designed for US Army Corps of Engineers Transatlantic Programs Center. HVAC system of the building is provided by designing of air handling units, duct system and exhaust fans. AFFF (Aqueous Film Forming Foam) fire extinguishing system is designed for the Hangar bays.

Air Traffic Control Tower
(Tallil Air Base, Iraq) (09.2008-05.2009)
KBR & Kulak Construction Co.
Eight floor air traffic control tower in Tallil Air Base, Iraq. The tower has mechanical and electrical rooms, admin spaces, office spaces and a control cab. Complete mechanical design of the building is designed for US Army Corps of Engineers Transatlantic Programs Center

Medevac Helicopter Compound
(Camp Anaconda, Iraq) (10.2006-05.2007)
KBR & YUKSEL Cons.Co.
Mechanical design of helicopter hangars in Anaconda Airbase in Balad. The project involves several hangar in a helicopter apron.

Reception Secure Onward Integration Facility
(Camp Anaconda, Iraq) (10.2006-05.2007)
KBR & YUKSEL Cons.Co.
This is a pax terminal building with inbound and outbound parts separated with 4 hour rated fire wall. Pre-engineered steel structure. All Mechanical, Pumbing Works, designed for US Army Corps of Engineers Transatlantic Programs Center.

C-130 Expeditionary Fabric Hangars
(Camp Anaconda, Balad, Iraq) (10.2006-05.2007)
KBR & YUKSEL Cons.Co.
Complete mechanical and fire protection system design of two C-130 aircraft hangars located in camp anaconda, Balad, Iraq Airfield. The project is designed for US Army Corps of Engineers Transatlantic Programs Center. Two Fabric Hangars are designed for C-130 Aircrafts in this project. One is general maintenance hangar and the other is fuel cell maintenance hangar. Complete mechanical design of the hangars and support buildings have been completed. This project had been designed for US Army Corps of Engineers Transatlantic Programs Center. High expansion foam fire extinguishing system is designed for the hangar. HVAC systems include packaged air conditioning units, ducting and special exhaust systems to provide specific ventilation requirements of the hangar.